Tolyatti, Obvodnaya st., building No. 5-A, Postal code 445140
A separate division in Tolyatti has been opened and is active since September 2024. Assembly, inspection, packaging and shipment of finished products are carried out on an area of 3,015 square meters.
The new site allowed to increase in the production volume of prefabricated parts, and to manage parts in large warehouses that provide storage and acceptance of goods, thereby optimizing the logistics chain between AE-2 and sub suppliers. In addition, the Tolyatti site has a separate quality control point for finished products and semifinished products to ensure a high level of finished products.
The new workplace offers transportation from two districts of Tolyatti. At the moment, more than 50 employees are already working at the site, and their number continues to grow.





